The Challenge
Renovating the historic Four Seasons George V required preserving classical architectural details while modernizing the lighting infrastructure to contemporary luxury standards and energy regulations.
Our Solution
Our team developed miniaturized fixtures that could be discretely integrated into ornate ceiling moldings. Period-appropriate decorative fixtures were manufactured with modern LED technology, while a sophisticated DALI-2 control system managed over 500 individually addressable points.
Results
- 55% energy reduction from previous system
- Preserved all heritage architectural details
- Won European Hospitality Design Award
- Replicated for 3 additional Four Seasons properties